Open top loading costs are driven by six things: the container itself, how tall and heavy your cargo is, the crane lift it needs, how it must be secured and covered, port handling and timing, and the onward move after loading. Open top loading is the method used when cargo is too tall to load through container doors or needs to be lifted in from above by crane — the roof (a removable tarpaulin or hard top) comes off, the crane lowers the piece in, and the load is then lashed, blocked and covered for the voyage. Because every over-height piece lifts differently, there is no honest flat price for this work. In this guide we explain each cost driver in plain terms, what a low quote usually leaves out, and the exact details that produce an accurate, firm quote from TRT International at Port Newark-Elizabeth and the Port of Savannah.
Open Top Loading in Brief: What You Are Paying For
When you pay for open top loading, you are not just paying for a container. You are paying for a coordinated lift: the right open-top unit positioned where the crane can work, a lift plan matched to the weight and centre of gravity of your piece, rigging and spreader equipment, a crew that sets the piece down without damage, securing and lashing inside the container, dunnage and blocking, the tarpaulin or cover refitted correctly, and documentation and photos of the finished load. If any one of those elements is missing from a quote, the price may look lower — until the missing work appears later as a delay, a re-handle, or a rejected load. Our open top loading service page describes the service itself; this post is about how its price is built.
Cost Driver 1: The Container and Its Availability
Open-top containers come mainly in 20-foot and 40-foot sizes, with either a removable tarpaulin roof or, less commonly, a hard top. The size your cargo needs is set by its length, width and weight — not by preference. A piece that fits a 20-foot unit should not be quoted on a 40-foot unit, and the reverse mistake is worse: a container that is too small cannot be fixed on the day. Availability also affects price. Open tops are a smaller part of any container fleet than standard dry boxes, so at busy times the equipment has to be sourced and positioned in advance. How far the empty unit has to travel to the loading point, and how quickly the loaded unit must be returned or delivered to the terminal, both feed into the equipment part of the cost.
Cost Driver 2: Height, Weight and the Shape of the Cargo
Height is the defining number in open top loading costs. A piece that sits just above the container’s internal height, under the tarpaulin with room to spare, is a straightforward job. A piece that protrudes well above the top rails becomes out of gauge: it needs a different securing plan, it may affect how the unit can be handled and stowed, and the carrier’s approval and surcharges can come into play. Weight matters just as much. A heavy piece concentrated on a small footprint needs load spreading and a stronger lift plan than the same weight spread evenly. The shape matters too — lifting points, centre of gravity, fragile projections, and whether the piece can be rigged from above at all all change the work involved. This is why accurate dimensions and a verified weight are the foundation of every firm quote, a point we also make in our guide to out of gauge cargo costs.
Cost Driver 3: The Crane Lift
Most open top loading costs turn on the lift. The crane has to be matched to the weight of the piece and the reach required — how far from the crane the container sits and how high the piece must travel. Rigging is part of the same calculation: slings, spreader bars and lifting beams that protect the cargo and keep it level, plus a lift plan that accounts for the centre of gravity so the piece does not tilt or swing as it is lowered. Time is the other factor. A single, well-prepared piece with clear lifting points can be set in one smooth pick. Multiple pieces, repositioning between picks, or a piece that has to be turned before it can be lowered all take longer — and crane time is priced by the job and the hours involved. Preparation is what keeps this driver down: cargo that arrives ready, with lifting points identified and obstructions removed, lifts faster and safer than cargo the crew has to problem-solve under the hook.
Cost Driver 4: Securing, Dunnage and the Cover
Lowering the cargo in is only half the job. Inside the container, the piece must be blocked, braced and lashed so it cannot move in any direction during handling, road transport and the ocean voyage. The materials — timber dunnage, blocking, lashing straps or chains, corner protection — and the labour to fit them are a real cost driver, and they scale with the weight and awkwardness of the piece. Work of this kind follows the same principles as our flat rack lashing service: enough lashing points, the right materials, and protection where straps cross edges or protruding parts. Then the cover has to go back on. A tarpaulin must be fitted and tensioned correctly so water cannot pool or work its way in, and if the cargo protrudes above the rails, the covering arrangement has to protect the exposed part. Skipping or rushing this stage is how cargo that was loaded perfectly still arrives wet or shifted.
Cost Driver 5: Port Handling, Drayage and the Clock
Where the loading happens changes the handling cost. TRT loads inside the port environment: our warehouses are IN Port Newark-Elizabeth and IN the Port of Savannah — not outside the gates with an extra road leg on both ends. In Newark our warehouses total 150,000 sq ft, and in Savannah our brand-new warehouse is 316,800 SF on 30 acres; those are our two main warehouse locations among the many warehouses we operate. Working in-port means the container, the cargo and the crane come together in one place, and our own local drayage fleet — 85+ Freightliner day-cab trucks and 300+ company chassis including tri-axles — moves the unit without waiting on an outside carrier. Timing is a cost driver in its own right: free time on the container, terminal cut-offs for the vessel, and storage clocks all run whether the load is ready or not. A loading slot missed because paperwork or cargo was late can turn into re-handling and storage charges. Cargo that needs to wait before or after loading can be held in our warehousing or outdoor storage, but a planned wait priced in advance is always cheaper than an emergency one.
Cost Driver 6: The Onward Move
The quote does not end when the tarpaulin goes on. The loaded container still has to reach the terminal for export, or, for an import, the cargo still has to travel onward after unloading. Distance, weight and route all matter: a heavy or protruding load moving by road may need permits, route checks and, in some cases, escort arrangements, and TRT runs bonded drayage and over-the-road transport throughout the US, Canada and Mexico with company drivers only. If the onward leg is quoted separately from the loading, compare the total, not the loading line alone — a cheap load followed by an expensive, unplanned road move is not a saving.
What a Low Open Top Quote Usually Leaves Out
When one quote is far below the others, the difference is rarely efficiency. More often, something is missing. Common gaps we see: crane time estimated for a single quick pick when the cargo needs several; securing materials and lashing labour not included; the tarpaulin refit and protection of protruding cargo ignored; container free time, re-handling and storage exposure not mentioned; out of gauge carrier surcharges discovered after booking; and the onward drayage or road leg left out entirely. Each gap becomes a change order, a delay, or a load the carrier refuses. A complete quote should itemise the equipment, the lift, the securing, the handling and the onward move, so you can see what you are buying — the same standard we set out in our open top loading guide.
How to Get an Accurate Open Top Loading Quote: A Checklist
Send these details and a firm price becomes possible:
- Exact dimensions of every piece: length, width and height, in order, with the tallest point identified
- Verified weight per piece, and the total weight
- Photos of the cargo from all sides, showing lifting points and any fragile or protruding parts
- The centre of gravity, if known, and any lifting instructions from the manufacturer
- Whether the cargo can be rigged from above, or needs a spreader beam or special rigging
- Packaging status: crated, skidded, wrapped, or bare — and any work you want done in our warehouse before loading
- Origin and destination: where the cargo is now, and where the loaded container must go
- Timing: vessel or delivery deadlines, and when the cargo will be ready
With those details, we can match the container, plan the lift, price the securing and handling, and quote the complete move — not just the cheapest-looking part of it.
How to Keep Open Top Loading Costs Down Without Cutting Corners
There are honest ways to reduce the price. Give verified weights and dimensions the first time, so the right container and crane are booked once, not twice. Prepare the cargo before it arrives: lifting points accessible, loose parts removed or secured, and the piece packed or wrapped as agreed. Consolidate pieces into one planned loading session instead of several small ones, so crane time is used once. Build in schedule margin so a small delay does not become storage and re-handling charges. And choose loading inside the port where possible — every extra road leg between storage, loading point and terminal adds handling, time and risk. What never saves money in the end is cutting the securing, rushing the cover, or booking a container the cargo does not fit.
Open Top or Flat Rack: Which Costs Less?
For some over-height cargo, a flat rack is the alternative — the piece sits on an open platform with no roof or sides, and is lashed down in the open. Neither option is automatically cheaper. An open top protects the cargo inside container walls with a cover overhead, and suits cargo that is tall but within the container’s footprint. A flat rack suits cargo that is too wide as well as too tall, or that cannot be lowered into a box at all — but it leaves the load exposed and usually needs more extensive lashing and weather protection. The right comparison is the total cost of each complete, properly secured move for your specific piece, which is why we quote both options when a shipment could go either way.
Talk to TRT About Your Over-Height Cargo
If you have cargo that will not fit through container doors, send us the dimensions, weight and photos and we will build a complete open top loading quote — equipment, lift, securing, handling and onward move — at Port Newark-Elizabeth or the Port of Savannah. TRT International, HQ 250 Port St, Newark, NJ 07114, and in Savannah at 117 A Parkway Dr, Rincon, GA 31326. Call us at +1 973 344 7100 ext 221. TRT International – Delivering Excellence since 1994.
Frequently Asked Questions
Q1: What is open top loading?
Open top loading is loading cargo into an open-top container from above, using a crane, after the removable roof or tarpaulin is taken off. It is used for cargo that is too tall to fit through the container doors or that cannot be pushed or driven in.
Q2: What drives open top loading costs the most?
The biggest drivers are the size and availability of the open-top container, the height and weight of the cargo, the crane lift it needs, and the securing and covering work after it is lowered in. Port handling, timing and the onward move add to the total.
Q3: Why does cargo height change the price so much?
Height decides whether the load stays under the tarpaulin or protrudes above the top rails and becomes out of gauge. A protruding load needs a different securing and covering plan, extra handling care, and may involve carrier approval and surcharges.
Q4: Is crane time included in an open top loading quote?
In a complete quote, yes — the crane, rigging and lift plan should be itemised as part of the loading cost. If a quote does not mention the lift at all, ask what it assumes, because crane time arranged later is rarely cheaper.
Q5: Can open top loading be done inside the port?
Yes. TRT loads in Port Newark-Elizabeth and in the Port of Savannah, where our warehouses are located inside the port, so the cargo, container and crane come together in one place and our own drayage fleet moves the loaded unit.
Q6: What information do I need for an accurate quote?
Exact dimensions and verified weight for every piece, photos showing lifting points and protrusions, packaging status, origin and destination, and your timing. With those details, the container, lift, securing and onward move can all be priced firmly.
Q7: Is a flat rack cheaper than an open top container?
Not automatically. A flat rack suits cargo that is too wide as well as too tall, but it leaves the load exposed and usually needs more lashing and weather protection. The honest comparison is the total cost of each complete, properly secured move.
Q8: How can I reduce open top loading costs?
Provide verified weights and dimensions first time, prepare lifting points and packaging before arrival, consolidate pieces into one loading session, allow schedule margin, and load inside the port to avoid extra road legs and re-handling.